GreenRoc Strategic - Interim Results for the six months to 31 May 2025
Released
Released
Announcement PDF
RNS Number : 1288X
GreenRoc Strategic Materials Plc
29 August 2025
GreenRoc Strategic Materials Plc / EPIC: GROC / Market: AIM / Sector: Mining
29 August 2025
GreenRoc Strategic Materials Plc
("GreenRoc" or the "Company")
INTERIM RESULTS FOR THE SIX MONTHS TO 31 MAY 2025
The Board of Directors of GreenRoc Strategic Materials Plc is pleased to report the Company's interim results for the six
months ended 31 May 2025. These incorporate the results of its subsidiary companies GreenRoc Graphite Limited (Formerly
Obsidian Mining Limited), NordGraph A/S, White Eagle Resources Limited ("WERL"), White Fox Resources Limited
("WFRL") and Greenland Graphite A/S (together, the "Subsidiary Companies", collectively with GreenRoc, the "Group").
Highlights
·
The Company was invited to participate in a UK Government trade mission to General Motors Company in Detroit, USA
in November 2024.
·
In December 2024, a memorandum of understanding ("MOU") was signed with Morrow Batteries ASA ("Morrow"), a
Norwegian company dedicated to developing and manufacturing sustainable and high-performance lithium-ion battery
cells.
·
In January 2025, GreenRoc received a Letter of Interest ("LoI") from the Export and Investment Fund of Denmark
("EIFO") for the provision of funding to GreenRoc's Amitsoq Graphite Project in South Greenland.
·
GreenRoc's Amitsoq project received an ESG certification through DigbeeTM and is the first minerals project in
Greenland with an official ESG certification. The Digbee ESG certificate is based on a thorough independent assessment.
·
Successful equity placings in February and June 2025 raised gross proceeds of £1.185 million (including shares issued in
lieu of fees), with the participation of Board and management.
·
A further test work series on Amitsoq graphite spheronisation and purification at ProGraphite's facilities in Germany were
initiated.
·
A General Election in Greenland led to the formation of a coalition government, with Naaja Nathanielsen being
reappointed as Minister for Mineral Resources in April 2025.
·
As part of GreenRoc's application for an Exploitation Licence for Amitsoq, submitted in September 2024, a formal
Project Description for the Mine was sent for public pre-consultation on 24 May 2025.
·
An update to the Thule Black Sands ilmenite project ("TBS") resource was announced in May 2025. The South Area of
the TBS deposit now has a Measured Resource of 1.1Mt at 6.3% ilmenite, an Indicated Resource of 15.9Mt at 3.8%
ilmenite and an Inferred Resource of 2.4Mt at 3.2% ilmenite.
·
GreenRoc's CEO was invited to present to a select group of potential finance institutions and off-take companies at a
closed session during the EU Raw Materials Summit in Brussels in May 2025.
Post period end highlights
·
On 4 June 2025, the EU Commission granted both GreenRoc's Amitsoq Mine and the proposed downstream graphite
active anode material ("AAM") plant the status of a "Strategic Project" under the EU Critical Raw Materials Act.
·
A contract was signed with contractor HK Transport to assist the Company with the extraction of a 15-20t bulk sample
from the underground workings at Amitsoq.
·
The pre-consultation phase of the Company's application for an Exploitation Licence for Amitsoq ended on 27 June 2025
enabling the Company to move towards the final submission of the White Book and revised Project Description. The
Company remains hopeful that the Exploitation Licence can be granted before the end of 2025.
·
A final series of baseline sampling studies relevant to the Amitsoq Environmental Impact Assessment commenced in July
2025.
·
In late July 2025 GreenRoc management reported that it had been invited to a series of meetings with EU representatives
to explore support options for the Amitsoq Project following the recognition of both the Amitsoq Mine and the
downstream AAM plant as Strategic Projects for the EU.
GreenRoc's CEO, Stefan Bernstein, commented:
"The EU's designation of Amitsoq as a "Strategic Project" under the Critical Raw Materials Act, combined with invitations to
present at high-level raw materials summits, highlights GreenRoc's central role in securing a stable and sustainable graphite
supply chain.
"GreenRoc's dedication to responsible and sustainable development is clearly demonstrated by the EIFO Letter of Interest, the
pioneering ESG certification through DigbeeTM - a first for Greenland - and the continued support of investors. The
achievement of these milestones underscore Amitsoq's journey to become a vital and ethically sourced graphite source for
Europe."
Corporate
Share placings in February and June 2025 raised gross proceeds of £1.185 million, with the participation of Board and
management. The February 2025 share placing included £500,000 from institutional investors, £165,000 from existing
shareholders, £50,000 from largest shareholder Alba Mineral Resources plc in lieu of fees and £17,500 from directors of the
Company in lieu of fees, raising an aggregate amount of £735,000 (before costs) at a price of 1.3 pence per share (the
"Fundraise"). For every two new ordinary shares issued, investors in the Fundraise received one warrant with an exercise price
of 2p per share and a two-year expiry date.
The June 2025 share placing raised £450,000 from an institutional investor, at a placing price of 2.5p per share. For every two
new ordinary shares issued, the investor received one warrant with an exercise price of 3.75p per ordinary share and a twoyear expiry date.
In July 2025 the Company announced that it had received a notice to exercise warrants over 3,846,153 new ordinary shares at
an exercise price of 2p per share, being some of the warrants issued in the February 2025 share placing, raising £76,923.06 for
the Company.
The Company has formed a Norwegian registered subsidiary to undertake work related to the production of graphite active
anode material ("AAM") for batteries.
Financial Results
The Group made a loss attributable to equity holders of the parent for the period, after taxation, of £432k (May 2024: £399k).
At the end of the reporting period, the Group's cash was £270k, a net cash inflow of £176k. This is made up of net funding of
£714k less exploration expenditure, creditor settlements and administration costs of £538k (including £256k of salaries and
other costs associated with the GreenRoc in-house technical and geological team).
The basic and diluted loss per share was 0.20 pence (May 2024: loss of 0.24 pence).
This announcement contains inside information for the purposes of the UK Market Abuse Regulation and the
Directors of the Company are responsible for the release of this announcement.
Forward Looking Statements
This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated
results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general
economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues,
new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a
new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of
prospecting rights, uncertainties regarding the Company's ability to execute and implement future plans, and the occurrence of
unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and
unknown risks and uncertainties and other factors.
For further information, please contact:
GreenRoc Strategic Materials Plc
Stefan Bernstein, CEO
+44 20 3950 0724
Cairn Financial Advisers LLP (Nomad)
Sandy Jamieson / Louise O'Driscoll
+44 20 7213 0880
Oberon Capital (Broker)
+44 20 3179 5300
Nick Lovering / Adam Pollock
About GreenRoc
GreenRoc Strategic Materials Plc is an AIM-quoted UK public company which is led by a group of highly experienced
mining industry professionals. The Company is focused on fast-tracking the Amitsoq Graphite Project in Greenland into a
producing mine to meet critical demand from Electric Vehicle ('EV') manufacturers in Europe and North America for new,
high grade and conflict-free sources of graphite. Amitsoq is one of the highest-grade graphite deposits in the world with a
combined Measured, Indicated and Inferred JORC Resource of 23.05 million tonnes (Mt) at an average grade of 20.41%
graphite, giving a total graphite content of 4.71 Mt, and significant further upside beyond this. Test work has proven that
Amitsoq graphite can be readily upgraded to high-grade, anode-quality graphite, with higher than 99.95% purity and relatively
little energy input, which bodes well for future production costs and sustainability commitments.
A Preliminary Economic Assessment released on 31 October 2023 gives a post-tax NPV8 for the Project of US$179M, an IRR
of 26.7% and capex estimated at US$131M (including a 25% contingency). These figures solely relate to the economics of a
mining and primary processing operation in South Greenland and do not take into account any potential upside from the
downstream processing operation which GreenRoc intends to establish. A Feasibility Study into the establishment of a
graphite spheronisation processing plant (published in May and July 2024) shows a post-tax NPV8 for the project of
US$621M, an IRR of 26.5% and capex estimated at US$340M (including a 25% contingency).
The Company has signed a Letter of Intent to secure an area for the Company's future Active Anode Materials Plant in
Southern Norway and has received expressions of support from the European Raw Materials Alliance and the US EXIM Bank
for future development. In November 2024, GreenRoc and Morrow Batteries a/s, a Norwegian Gigafactory signed a MoU to
work together on a regional supply chain of battery anode material and the Company received a Letter of Interest from the
Export and Investment Bank of Denmark (EIFO) in January 2025.
GreenRoc's Amitsoq and Anode Materials Plant project was announced a Strategic Project under EU's Critical Raw Materials
Act on June 4, 2025, and has an ESG certification via DigBeeTM since March 2025.
GreenRoc also owns the Thule Black Sands Ilmenite Project ('TBS') in Greenland, which has an initial Mineral Resource of
19Mt at 43.6% Total Heavy Minerals with an in-situ ilmenite grade of 8.9%.
UNAUDITED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
FOR THE SIX MONTHS ENDED 31 MAY 2025
Unaudited
Six months
ended 31 May
2025
£'000
-
Unaudited
Six months
ended 31 May
2024
£'000
23
23
Audited
12 months
ended 30 Nov
2024
£'000
Administrative expenses
Impairment
Operating loss
Finance expense
Foreign Exchange
Loss for the period before tax
Taxation
Loss for the period from continuing
operations
(431)
(431)
(1)
(432)
(432)
(420)
(397)
(1)
(1)
(399)
(399)
(830)
(830)
(1)
(778)
120
(658)
Loss attributable to equity holders of the
parent
(432)
(399)
(658)
Other income
Gross profit
53
53
Other comprehensive income
Items that may be subsequently reclassified
to profit or loss:
Exchange loss on translating foreign operations
Total comprehensive income
attributable to equity
Earnings per ordinary share
attributable to the ordinary equity
holders of the parent
Basic and diluted (pence)
(432)
(399)
(658)
(0.20)
(0.24)
(0.36)
UNAUDITED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AT 31 MAY 2025
Unaudited
31 May 2025
£'000
Unaudited
31 May 2024
£'000
Audited Year
30 Nov 2024
£'000
Non-current assets
Intangible fixed assets
Total non-current assets
9,955
9,955
10,000
10,000
9,930
9,930
Current assets
Trade and other receivables
Cash and cash equivalents
Total current assets
70
270
340
23
70
93
26
94
120
Current liabilities
Trade and other payables
Payable to parent entity
Total current liabilities
(133)
(133)
(385)
(385)
(253)
(253)
Net current assets/(liabilities)
207
(292)
(133)
Non-current liabilities
Deferred tax
Total non-current liabilities
(883)
(883)
(1,004)
(1,004)
(883)
(883)
Net assets
9,279
8,704
8,914
Capital and reserves
Share capital
Share premium
Share-based payment reserve
Retained earnings
Total equity
250
12,928
238
(4,137)
9,279
218
11,778
281
(3,573)
8,704
244
12,220
155
(3,705)
UNAUDITED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE SIX MONTHS ENDED 31 MAY 2025
8,914
Share
capital
Share
premium
Sharebased
payment
reserve
Retained
earnings
Total
£'000
£'000
£'000
£'000
£'000
At 1 December 2023
215
11,706
280
(3,174)
9,027
Loss for the period
-
-
-
(399)
(399)
Translation differences
-
-
-
-
-
Total comprehensive income for the
period
-
-
-
(399)
(399)
Shares issued
3
72
-
-
75
Fair value of share options awarded
-
-
1
-
1
At 31 May 2024
218
11,778
281
(3,573)
8,704
At 1 December 2023
215
11,706
280
(3,174)
9,027
Loss for the period
-
-
-
(658)
(658)
Total comprehensive income for the
period
-
-
-
(658)
(658)
Shares issued
29
514
-
-
543
Fair value of share options awarded
-
-
2
-
2
(127)
127
-
Fair value of share options expired
At 30 November 2024
244
12,220
155
(3,705)
8,914
Loss for the period
-
-
-
(432)
(432)
Total comprehensive income for the
period
-
-
-
(432)
(432)
Shares issued
6
708
-
-
714
Fair value of share options awarded
-
-
83
-
83
250
12,928
238
(4,137)
9,279
At 31 May 2025
UNAUDITED CONSOLIDATED CASH FLOW STATEMENT
FOR THE SIX MONTHS ENDED 31 MAY 2025
Cash flows from operating activities
Operating loss
Adjustments for:
Share-based payment charge
Impairment
(Decrease) in creditors
(Increase)/decrease in debtors
Net cash used in operating activities
Cash flows from investing activities
Capitalised exploration expenditure
Net cash used in investing activities
Unaudited
Six months
ended 31
May 2025
£'000
Unaudited
Six months
ended 31
May 2024
£'000
Audited
12 months
ended 30 Nov
2024
£'000
(432)
(397)
(778)
83
1
(120)
(44)
(513)
(12)
413
5
2
(144)
409
(511)
(25)
(25)
(160)
(160)
(90)
(90)
Cash flows from financing activities
Proceeds from issue of shares
Repayment of loan from parent
Receipts of borrowings from parent
Finance expense
Net cash generated from financing activities
Net increase/(decrease) in cash and cash
equivalents
FX on cash and cash equivalents
Cash and cash equivalents at beginning of
period
Cash and cash equivalents at end of period
714
714
75
(2)
73
543
-
176
(82)
(58)
94
152
152
270
70
94
543
NOTES TO THE HALF-YEARLY FINANCIAL INFORMATION
1.
Basis of preparation
The Group consolidates the financial statements of the Company and its subsidiary undertakings.
The financial information has been prepared under the historical cost convention in accordance with UK-adopted International
Accountant Standards ("UK-adopted IAS") as they apply to the Group for the six months ended 31 May 2025.
2.
Taxation
No charge for corporation tax for the period has been made due to the expected tax losses available.
3.
Loss per share
Basic loss per share is calculated by dividing the loss attributable to ordinary shareholders of £432k (May 2024: 399k;
November 2024: £658k) by the weighted average number of shares of 212,787,780 (May 2024: 166,610,052; November
2024: 180,677,314) in issue during the period. The diluted loss per share calculation is identical to that used for basic loss per
share as the exercise of warrants would have the effect of reducing the loss per ordinary share and therefore is not dilutive
under the terms of Financial Reporting Standard 22 "Earnings Per Share".
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority
to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information
may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For
further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
IR DZGZRVRRGKZM
Share your feedback
Discover