From drill core to mine design at Amitsoq

The Amitsoq field season is closing, but work on this season’s drill core continues. A crew in Nanortalik will finish logging and sampling the core, turning the recovered rock into information for the project’s geological and engineering studies.
Logging records the rock along each drill hole, helping geologists understand the sequence encountered and select intervals for sampling.
The samples serve two purposes. Graphite-bearing ore will be assayed to measure its graphite content. Samples of the surrounding host rock will be tested for strength, providing measured data for the geotechnical work.
Together, these investigations add detail to the understanding of Amitsoq’s mineralisation and the rock conditions that inform mine design, carrying this season’s drilling into the next stage of technical assessment.
#GreenRoc #GROC #Amitsoq #Graphite #Geology #MineDesign